Project:
DR_DAVE'S_RV-10
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (111)
Research
- (1)
-
Logo
Tools
Workshop
- (2)
-
Practice Kit
-
Workshop Area
Tail Feathers
- (83)
-
Replaced Finished...
-
Tail Tie Down
-
IA progress inspection
-
Counterweight
-
Elevator Counterweight
-
Riveting elevator...
-
Riveting Elevator...
-
Riveting Hinge...
-
Riveting Hinge Halves
-
Elevator Trailing Edge
-
SB-00043
-
SB-00043 more
-
SB-00043
-
Trim Tabs
-
Riveting skins
-
re-prime
-
Trim tab trailing edges
-
Begin prep for SB-00043
-
Tip Ribs
-
Tip Ribs LCP...
-
Elevator Trim Tabs
-
Elevator Assembly -...
-
Back Riveting Ribs...
-
Elevator Assembly
-
Elevator and Trim...
-
Prep and Alodine...
-
Etch Prime Elevator...
-
Trim Tab Horns
-
Elevator Spars -...
-
HS Finished!!
-
Bottom Side HS
-
HS final steps
-
Bottom Skins
-
Bottom Skins
-
H Spar Rivering...
-
Bottom and Top Skins
-
Nose Ribs to Skin
-
Elevator Parts...
-
Elevator Gusset
-
VS Nose Ribs and...
-
Tip Ribs - Long Day
-
Elevator Tip Ribs,...
-
Elevator Ribs
-
Elevator Ribs -...
-
Assembling Front Spar
-
Elevator
-
Front Spar and Nose...
-
Riveting Inspar Ribs...
-
Epoxy Priming HS Parts
-
Countersinking...
-
New HS-1014 and...
-
HS Alodine Parts
-
HS Stringer Web and...
-
Dimpling HS Parts
-
HS Stringers,...
-
More Riveting Progress
-
Riveting HS Spars
-
Alodine and Prime HS...
-
Counterinking HS Spars
-
HS Rib Mods and...
-
Milling of HS Spars...
-
Rudder Counterweight...
-
Rudder Leading Edge
-
Rudder Trailing Edge
-
Rudder Assembly
-
Rudder Innards Assembly
-
Assembly of Vertical...
-
Still on the road
-
Back to Work
-
Elevator Spar
-
Rudder
-
Rudder
-
Finishing Up...
-
Vertical Stabilizer...
-
Vertical Stabilizer
-
Rudder Stiffeners
-
Rudder Stiffeners
-
VS and Rudder
-
Deburring Rudder Parts
-
Short Night
-
Vertical Stabilizer
-
Riveting elevator...
Empennage
- (6)
-
On the Road again
-
Disassemble of tailcone
-
Upper Rear Skin...
-
Back from a three...
-
More Empennage build
-
Empennage Build
Fuselage
Firewall
Wings
- (2)
-
LCP replacement Parts
-
Wing Kit Inventory
Controls
Avionics
Lighting
Instrument Panel
Landing Gear
Engine
Propeller
Fuel System
Interior Finish
Paint / Decals
- (2)
-
Epoxy Prime Alodined...
-
Paint Booth Completed
Inspection
Misc.
- (14)
-
Been on the road
-
Van's Laser Drill...
-
Van's Laser Drill...
-
Oshkosh 2023
-
Duramax LBZ all back...
-
Still rebuilding LBZ
-
Putting Engine back...
-
Taking a break for a...
-
In Europe for a...
-
Back from OSH
-
Conversion Coating
-
Conversion Coating -...
-
Alodine Work Area
-
Inventory
Mis-Steakz
- (1)
-
Mistakes in process...
Builder Name:
DAVE LEHMAN
-
Project:
Vans - RV-10
-
VIEW REPORTS
Total Hours:
452.1
Total Flight Time:
Start/Last Date:
Oct 01, 2020 - Feb 03, 2026
Friendly URL:
https://eaabuilderslog.org?s=DR_DAVE'S_RV-10
Home or Last Project Picture
Apr 05, 2023
Still rebuilding LBZ
Category: Misc.
OK. Turbocharger overhauled, new billeted compressor wheel. Have the new heads installed, the valve-lash adjusted, valve covers back on and the new injectors and glow plugs with a new high-pressure fuel rail assembly installed. Y-Bridge intake (red) was also installed, but had to replace OEM nuts with SS allen hex head screws and grind down the head of the aft passenger side screw to clear the compressor housing. I'm on the road flying now but back end of week (15-APR)
Turbo Rebuild Supplies
Also refinished reluctor surfaces
New 11-Blade Compressor Wheel
Compressor Cover Installed
Turbine Side
New Up-Pipes and Downpipes
Strapped due to Earthquake Propensity
Turbo Reinstalled
Exhaust Manifold on Driver Side Head
1 stud bolt in position with tie wrap
ARP Studs
Thread chased stud holes
Mahle Type C Gaskets
Head in place
42/85/125 ft-lbs torque steps
Ready for Valve Lifters reinstallation
Valve assembly back in
Valve Lash @ 0.012 "
Lash Adjustment Procedure
Lash Adjustment Cheat Sheet
Valve Covers ready
Valve Covers back on
Injectors and Fuel Rail back on
Glow plugs and Y-Bridge installed